RESCUE Deliverables

Rescue Deliverable

List of deliverables and reviews

DELIVERABLE NUMBER DELIVERABLE NAME WP NUMBER DELIVERY DATE  
D1.1 System scenarios and technical requirements WP1 M6  
D1.2.1 Assessment on Feasibility, Achievability, and Limits WP1 M18  
D1.2.2 Theoretical Results Update of Assessment on Feasibility, Achievability, and Limits WP1 M34

  

D1.3 Report of Wireless Access & Multiple Antenna Technologies WP1 M24

  

D1.4 Intermediate Results of Wireless Access and Multiple Antennas Technologies WP1 M12

  

D2.1.1 Interim Report of Detailed Coding/Decoding Algorithms and Correlation Estimation Techniques WP2 M12

  

D2.1.2 Final Report of The Coding/Decoding Algorithms and Performance Comparison WP2 M33  
D2.2.1 Interim Report of Detailed Optimisation Algorithm and Performance Comparisons WP2 M18  
D2.2.2 Final Report of Detailed Optimisation Algorithm and Performance Comparisons WP2 M33  
D2.3 Feasibility Assessment in Model Based Environments WP2 M24   
D3.1 MAC and routing architecture and interfaces specification WP3 M12

  

D3.2 Report on revised WP3 architecture including simulation results WP3 M20  
D3.2 Revised Report on revised WP3 architecture including simulation results WP3 M26  
D3.3 Report on implementation of the WP3 architecture WP3 M30  
D4.1 Report on Considered Scenario for Performance Validation and Field Trials WP4 M6  
D4.1 New Release Report on Considered Scenario for Performance Validation and Field Trials WP4 M21  
D4.2 Report on V2V Channel Measurement Campaign WP4 M12  
D4.3 Report on channel analysis and modelling WP4 M21  
D4.4 Final report on practical assessment of the RESCUE architecture WP4 M36  
D5.1 RESCUE impact on industry WP5 M6  
D5.3 Report on technical workshop 1st Release WP5 M21  
D5.4 First Dissemination, Standardization and Exploitation Report WP5 M18  
D5.5 Report from technical workshop Final Release WP5 M36  
D5.6 Final Dissemination, Standardization and Exploitation Report WP5 M36  

Follow us on: